MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building

Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building, This news data comes from:http://sgsy-ykp-kxf-ve.erlvyiwan.com
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- China displays its weaponry in a tightly controlled military parade
- Immigration: 1st lookout bulletin in effect on 35 individuals, including Discayas, linked to anomalous flood control projects
- US church shooter 'obsessed with idea of killing children'
- Modi reaffirms India's support for Ukraine peace settlement during call with Zelenskyy
- PNP chief Torre relieved from post — Palace
- LPA has big chance of intensifying into tropical cyclone to be named ‘Kiko’
- Philippines nears universal healthcare, 80% goal achieved -- Marcos
- Batangas engineer suspended after alleged bribery attempt on congressman Leviste
- Trump tells Europe to put economic pressure on China over Ukraine
- 40% of Filipinos are now obese, says Health expert